Using the inching pedals installed in front of each drawing block, make capstan No.1 rotate. Once capstan no.1 is thread-up with wire, proceed forward to the capstan no.2.
To ensure that the capstan no.1 is synchronized, close the protection door of the drawing block no.1.
To proceed to thread-up of capstan no.3, the rpotection door of the drawing block no.2 must be closed.
This type of synchronization has been programmed in such way to ensure that after a head-to -head welding due to a wire break the loosen wire is recovered.
If the wire is loosen between the drawing capstans no.3 and no.4, it is enough to open the safety door of drawing block no.3 to stop the drawing blocks no.2 while inching the drawing block no.4.
After the operator has made the point to the wire using the pliers, proceed to the string-up of the drawing capstan, giving four complete laps of wire of 360.
Now proceed with the string-up of the drawing blocks and of the spooler.